October | Print |
Written by Arlene V. Hepiga   
COTABATO LIGHT & POWER COMPANY
RATE PROFILE - COMPARATIVE
RATE SCHEDULE
October 2017
Unit Residential Gen. Retail Service 1 (<=20KW) Gen. Retail Service 2 (>=20KW &<=40KW) Gen. Retail Service 3 (>=40KW &<=200KW) Gen. Retail Service 4 (>200KW) Flat Lighting Service
Generation Charge PhP/kWh 3.6892 3.6892 3.6892 3.6892 3.6892 3.6892
Power Act Reduction % 72.30%
Transmission Charge PhP/kWh 0.5783 0.6177 0.5179 0.4943 0.4423 0.7989
PhP/kW 260.4703 177.7131 226.2018
System Loss Charge PhP/kWh 0.3557 0.3603 0.4549 0.4103 0.4010 0.3783
Distribution Charge PhP/kWh 1.9002 1.9002 0.3193 0.2748 0 2.0783
PhP/kW 362.12 291.08 345.77
Supply Charge PhP/Cust/Mo. 138.97 285.92 2008.16 78.96
PhP/kWh 0.1802 0.1802
Metering Charge PhP/Meter/Mo. 5.00 5.00 237.39 338.21 4,540.26 0
PhP/kWh 0.4573 0.4573
Fuel Recovery Charge PhP/Kwh
Fuel Recovery ERC Case#2011-068RC PhP/Kwh





Automatic Fuel Recovery PhP/Kwh 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
Lifeline Rate Subsidy (PhP/Kwh) PhP/kWh 0.0631 0.0631 0.0631 0.0631 0.0631 0.0631
(In excess of 80 Kwh) PhP/kWh 0.0631
Senior Citizen Subsidy PhP/kWh 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Inter-Class Cross Subsidies PhP/kWh
Surcharge % 0.02 0.02 0.02 0.02 0.02 0.02
Franchise Tax % 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025
VAT Rates
Generation Charge P/Kwh 0.2313 0.2313 0.2313 0.2313 0.2313 0.2313
Transmission Charge P/Kwh 0.0022 0.0024 0.0060 0.0043 0.0039 0.0031
System Loss Charge P/Kwh 0.0220 0.0220 0.0220 0.0220 0.0220 0.0220
Gen. Rate SL VAT P/Kwh 0.0217 0.0217 0.0217 0.0217 0.0217 0.0217
Trans. SL VAT P/Kwh 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Distribution Revenue P/Kwh 0.12 0.12 0.12 0.12 0.12 0.12
Others P/Kwh 0.12 0.12 0.12 0.12 0.12 0.12
Universal Charge (PhP/Kwh)
Missionary Electrification P/Kwh 0.1561 0.1561 0.1561 0.1561 0.1561 0.1561
UCME - Subsidy P/Kwh 0.0454 0.0454 0.0454 0.0454 0.0454 0.0454
UCME - True-up Adjustment for Cys 2003-2009 and for CY 2011 P/Kwh 0.0709 0.0709 0.0709 0.0709 0.0709 0.0709
UCME - True-up Adjustment for CY 2010 P/Kwh 0.0381 0.0381 0.0381 0.0381 0.0381 0.0381
UCME - RE Developer P/Kwh 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017
Environmental Charge P/Kwh 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025
Stranded Contract Costs P/Kwh 0.1938 0.1938 0.1938 0.1938 0.1938 0.1938
NPC Stranded Debts P/Kwh 0.0265 0.0265 0.0265 0.0265 0.0265 0.0265
Feed-in Tariff Allowance (FIT-ALL) P/Kwh 0.1830 0.1830 0.1830 0.1830 0.1830 0.1830
Note:
1.  Local Franchise Tax, Cotabato City is 0.0025,  Maguindanao 0.0050 of the total amount excluding universal charge & VAT.
2.  12% VAT on distribution & other charges effective Feb. 1, 2006.
3.   Fuel & Lubricant cost recovery of  Php0.0298/kwhr starting October, 2010 billing (ERC Case No. 2010-023 RC).
3.  Full Removal of Inter-Class Cross Subsidy effective August, 2007 billing per Energy Regulatory Commission  Case#2001-898 dtd
Sept. 12, 2005.
4.  Universal Charge for Missionary Electrification  is PhP0.1163  starting Sept./11 billing.  ERC order under  ERC Case No. 2011-074 RC.
NPC-SPUG Recovery of the shortfalls in the ME subsidy  for CY 2003 to 2009 under the True-up Mechanism pursuant to the
Commission's Resolution No. 11. Series of 2005 is PhP0.0709/Kwh on top of the existing UC-ME of PhP0.0454/Kwh.
5.  Universal Charge for Stranded Contract Costs of PhP0.1938/kWh starting April 2013 Billing. ERC Case No. 2011-091 RC docketed Feb. 19, 2013.
6.  Universal Charge for Missionary Electrification RE Developer of PhP0.0017/kWh starting January 2014 Billing. ERC Case No. 2012-085
RC docketed Oct. 14, 2013.
7.  Feed-In-Tariff Allowance of PhP0.0406/kWh implemented starting Feb. 2015 billng in compliance with ERC Case No. 2014-019 RC.
8.  Feed-In-Tariff Allowance increased from Php0.0406/kWh to Php0.1240/kWh effective April 2016 rate/billing in compliance with
ERC Case No. 2015-216 RC Order dtd 2-12-16.