COTABATO LIGHT & POWER COMPANY
ERC CASE NO. 2001-898 AND 2001-503
RATE SCHEDULE
June 2017

 

Gen. Retail Gen. Retail Gen. Retail
Residential Service 1 Service 2 Service 3 Gen. Retail Flat
(< = 20KW) (>20KW & (> 40KW & Service 4 Lighting
<=40KW) < = 200KW) (> 200KW) Service
Generation Charge (PhP/kWh) 3.6561 3.6561 3.6561 3.6561 3.6561 3.6561
Transmission Charge (PhP/Kwh) 0.5319 0.6149 0.5179 0.4943 0.4423 0.8377
(PhP/KW) 289.1499 183.5817 237.0282
Distribution Charge (PhP/Kwh) 1.9002 1.9002 0.3193 0.2748 0.0000 2.0783
(PhP/KW) 362.12 291.08 345.77
Customer Charges
Supply Charge (PhP/Cust/Mo.) 138.97 285.92 2,008.16 78.96
(PhP/Kwh) 0.1802 0.1802
Metering Charge (PhP/Meter/Mo.) 5.00 5.00 237.39 338.21 4,540.26 0
(PhP/Kwh) 0.4573 0.4573
Fuel Recovery Charge (PhP/Kwh) - - - - - -
Fuel Recovery ERC Case#2011-068RC 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Automatic Fuel Recovery (Php/kwh) 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045
System Loss Charge (PhP/Kwh) 0.3252 0.3333 0.4353 0.3860 0.3731 0.3535
Inter-Class Cross
Subsidy (PhP/Kwh) - - - - - -
Lifeline Rate Subsidy (PhP/Kwh) 0.0556 0.0556 0.0556 0.0556 0.0556
(In excess of 80 Kwh) 0.0556
Senior Citizen Subsidy (Php/Kwh) 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Universal Charge (PhP/Kwh)
Missionary Electrification 0.1561 0.1561 0.1561 0.1561 0.1561 0.1561
UCME - Subsidy 0.0454 0.0454 0.0454 0.0454 0.0454 0.0454
UCME - True-up Adjustment for Cys 2003-2009 and for CY 2011 0.0709 0.0709 0.0709 0.0709 0.0709 0.0709
UCME - True-up Adjustment for CY 2010 0.0381 0.0381 0.0381 0.0381 0.0381 0.0381
UCME - RE Developer 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017
Environmental Charge 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025
Stranded Contract Costs 0.1938 0.1938 0.1938 0.1938 0.1938 0.1938
Feed-in Tariff Allowance (FIT-ALL) 0.1830 0.1830 0.1830 0.1830 0.1830 0.1830
VAT RATES:
Generation Rate VAT 0.2456 0.2456 0.2456 0.2456 0.2456 0.2456
Transmission Rate VAT 0.0021 0.0024 0.0067 0.0046 0.0041 0.0033
System Losses VAT 0.0216 0.0216 0.0216 0.0216 0.0216 0.0216
Genco 0.0213 0.0213 0.0213 0.0213 0.0213 0.0213
Transco 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Distribution Revenue (02-01-06) 12.00% 12.00% 12.00% 12.00% 12.00% 12.00%
Other Charges 12.00% 12.00% 12.00% 12.00% 12.00% 12.00%
Power Act Reduction Rate 79.17%(0.23752)
NPC/TSI/WMPC/TMI/SPPC & NGCP Rate 4.0612

 

Note:
1.  Local Franchise Tax, Cotabato City is 0.0025,  Maguindanao 0.0050 of the total amount excluding universal charge & VAT.
2.  12% VAT on distribution & other charges effective Feb. 1, 2006.
3.   Fuel & Lubricant cost recovery of  Php0.0298/kwhr starting October, 2010 billing (ERC Case No. 2010-023 RC).
3.  Full Removal of Inter-Class Cross Subsidy effective August, 2007 billing per Energy Regulatory Commission  Case#2001-898 dtd
Sept. 12, 2005.
4.  Universal Charge for Missionary Electrification  is PhP0.1163  starting Sept./11 billing.  ERC order under  ERC Case No. 2011-074 RC.
NPC-SPUG Recovery of the shortfalls in the ME subsidy  for CY 2003 to 2009 under the True-up Mechanism pursuant to the
Commission's Resolution No. 11. Series of 2005 is PhP0.0709/Kwh on top of the existing UC-ME of PhP0.0454/Kwh.
5.  Universal Charge for Stranded Contract Costs of PhP0.1938/kWh starting April 2013 Billing. ERC Case No. 2011-091 RC docketed Feb. 19, 2013.
6.  Universal Charge for Missionary Electrification RE Developer of PhP0.0017/kWh starting January 2014 Billing. ERC Case No. 2012-085
RC docketed Oct. 14, 2013.
7.  Feed-In-Tariff Allowance of PhP0.0406/kWh implemented starting Feb. 2015 billng in compliance with ERC Case No. 2014-019 RC.
8.  Feed-In-Tariff Allowance increased from Php0.0406/kWh to Php0.1240/kWh effective April 2016 rate/billing in compliance with
ERC Case No. 2015-216 RC Order dtd 2-12-16.
9.   SPPC under recovery in the amount of Php 16,331,594.80 including VAT at Php0.0913 & 0.0110 will be recovered starting January 2017 to Dec. 2017.

 

 

COTABATO LIGHT & POWER COMPANY
ERC CASE NO. 2001-898 AND 2001-503
RATE SCHEDULE
#REF!
Gen. Retail Gen. Retail Gen. Retail
Residential Service 1 Service 2 Service 3 Gen. Retail Flat
(< = 20KW) (>20KW & (> 40KW & Service 4 Lighting
<=40KW) < = 200KW) (> 200KW) Service
Generation Charge (PhP/kWh) 3.6561 3.6561 3.6561 3.6561 3.6561 3.6561
Transmission Charge (PhP/Kwh) 0.5319 0.6149 0.5179 0.4943 0.4423 0.8377
(PhP/KW) 289.1499 183.5817 237.0282
Distribution Charge (PhP/Kwh) 1.9002 1.9002 0.3193 0.2748 0.0000 2.0783
(PhP/KW) 362.12 291.08 345.77
Customer Charges
Supply Charge (PhP/Cust/Mo.) 138.97 285.92 2,008.16 78.96
(PhP/Kwh) 0.1802 0.1802
Metering Charge (PhP/Meter/Mo.) 5.00 5.00 237.39 338.21 4,540.26 0
(PhP/Kwh) 0.4573 0.4573
Fuel Recovery Charge (PhP/Kwh) - - - - - -
Fuel Recovery ERC Case#2011-068RC 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Automatic Fuel Recovery (Php/kwh) 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045
System Loss Charge (PhP/Kwh) 0.3252 0.3333 0.4353 0.3860 0.3731 0.3535
Inter-Class Cross
Subsidy (PhP/Kwh) - - - - - -
Lifeline Rate Subsidy (PhP/Kwh) 0.0556 0.0556 0.0556 0.0556 0.0556
(In excess of 80 Kwh) 0.0556
Senior Citizen Subsidy (Php/Kwh) 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Universal Charge (PhP/Kwh)
Missionary Electrification 0.1561 0.1561 0.1561 0.1561 0.1561 0.1561
UCME - Subsidy 0.0454 0.0454 0.0454 0.0454 0.0454 0.0454
UCME - True-up Adjustment for Cys 2003-2009 and for CY 2011 0.0709 0.0709 0.0709 0.0709 0.0709 0.0709
UCME - True-up Adjustment for CY 2010 0.0381 0.0381 0.0381 0.0381 0.0381 0.0381
UCME - RE Developer 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017
Environmental Charge 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025
Stranded Contract Costs 0.1938 0.1938 0.1938 0.1938 0.1938 0.1938
Feed-in Tariff Allowance (FIT-ALL) 0.1830 0.1830 0.1830 0.1830 0.1830 0.1830
VAT RATES:
Generation Rate VAT 0.2456 0.2456 0.2456 0.2456 0.2456 0.2456
Transmission Rate VAT 0.0021 0.0024 0.0067 0.0046 0.0041 0.0033
System Losses VAT 0.0216 0.0216 0.0216 0.0216 0.0216 0.0216
Genco 0.0213 0.0213 0.0213 0.0213 0.0213 0.0213
Transco 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Distribution Revenue (02-01-06) 12.00% 12.00% 12.00% 12.00% 12.00% 12.00%
Other Charges 12.00% 12.00% 12.00% 12.00% 12.00% 12.00%
Power Act Reduction Rate 79.17%(0.23752)
NPC/TSI/WMPC/TMI/SPPC & NGCP Rate 4.0612